An energy management system (EMS) measures and controls when the solar PV, battery storage, charging stations and large loads of a commercial site draw or deliver electricity. It becomes relevant once a site pays a demand charge or combines several of these systems: every kW capped for good saves CHF 108 a year at the 2026 median demand charge. It needs 15-minute metering data, open interfaces and the distribution system operator's connection conditions.
Key Takeaways
7 min read
Key Takeaways
7 min read- The demand charge sets the pace At the 2026 median tariff every kW of peak costs CHF 108 a year. An EMS caps peaks before the meter records them.
- No control without 15-minute data The basis is the load profile in a 15-minute grid and your own metering at the grid connection.
- Open interfaces keep options open Modbus and OCPP keep the system open for the next battery or the next charging station.
- Defer grid reinforcement At MAN Truck & Bus the EMS makes an immediate increase of the grid connection unnecessary.
On a commercial site, energy management has three jobs: lowering the load peak and with it the demand charge, consuming more of your own solar electricity, and making full use of the existing grid connection before it has to be reinforced. This article shows when a site needs an EMS, what data and interfaces it requires and how the introduction works. What an EMS is in technical terms is explained in the glossary entry energy management system.
When does a commercial site need an energy management system?
Not every business needs one. It becomes relevant when at least one of four triggers applies.
- The site pays a demand charge. Grid operators bill larger customers for the highest measured power on top of the kilowatt-hours. For a business with a 400 kW peak the 2026 median is CHF 108 per kW and year, with the middle half of grid operators between CHF 88 and CHF 127 (ElCom, 286 grid operators). Only 15 of 301 grid operators charge no separate demand charge.
- PV and battery storage are to work together. A battery that charges only by fixed rules is full at midday, when the peak comes in the afternoon. Only the controller decides how much capacity stays reserved for the peak.
- Charging stations are added. Several vehicles charging at the same time set a new peak. Load management distributes the available power across the charging points.
- The grid connection is at its limit. Reinforcing the connection takes time and money. An EMS keeps consumption below the agreed capacity and buys time.
How much the first point weighs depends on the tariff sheet. At EKZ, CKW, AEW and BKW the highest 15-minute value of each month counts in 2026, at SIG in Geneva the highest of the whole year. A single uncontrolled peak therefore costs money for a month or a year. The calculation is in the guide peak shaving for commercial and industrial businesses.
What data and interfaces does an energy management system need?
An EMS is only as good as its readings. It needs two data sources and open paths to every system it is meant to control.
The first source is the site’s load profile: grid operators provide 15-minute values through smart metering systems (Art. 8a StromVV). Over months they show when and how often peaks occur, and they are the basis for sizing. The second source is your own real-time metering at the grid connection point, because the EMS must detect a peak before the meter’s 15-minute interval has closed.
Control runs over standardised protocols: Modbus for inverters and batteries, OCPP for charging stations. A system that only addresses one manufacturer’s devices ties every later extension to that supplier.
Requirements for an energy management system
- Metering at the grid connection point
Your own power meter with real-time values, independent of the grid operator's meter.
- Open protocols
Modbus for PV and battery storage, OCPP for charging stations. No lock-in to one hardware manufacturer.
- Adjustable priorities
Peak limiting, self-consumption and charging in an order that the business sets and changes itself.
- Grid operator requirements
Agreed consumption and feed-in capacity stored in the system as a hard limit.
- Access to your own data
Export of readings in an open format, so that analyses do not depend on the supplier.
How do you introduce an energy management system?
The introduction starts with the data, not the product. Buy the system first and you end up defining the requirements afterwards.
Energy management in four steps
Analyse the load profile
We analyse the 15-minute values of the last twelve months: height and frequency of the peaks, base load, PV surpluses. This shows which peaks can be shifted.
Define the requirements
Which systems are controlled, with which priority, and which limits the grid operator sets. This is the basis for a manufacturer-independent choice of system.
Integrate and commission
Metering at the grid connection, connection of inverters, battery and charging points, testing of the limits before the first month of live operation.
Operate and fine-tune
Monthly comparison of measured peak and target value. If operations change, for example with new machines or vehicles, limits and priorities are adjusted.
The load profile from the first step also answers whether a battery belongs in the system. An EMS on its own only shifts loads that can be shifted; peaks from processes that have to run need stored energy. What a battery of which size delivers is shown on the page battery storage.
What does energy management achieve in practice?
Two charging sites show what energy management is used for in commercial settings.
At MAN Truck & Bus Schweiz in Otelfingen, Ampere Dynamic acted as general contractor for a 383 kWp PV system, a fast-charging station for electric commercial vehicles and an energy management system. The EMS controls the energy flow between grid connection, solar electricity, consumption and charging station, and reduces load peaks. As a result, no immediate increase of the grid connection was needed; the main distribution board is designed for 1’000 A and leaves room for expansion.
At Gebrüder Weiss in Altenrhein, the load management of the charging system distributes 500 kW of DC charging power in steps of 62.5 kW across the connected electric trucks. Each vehicle receives as much power as it can take at that moment, and the power electronics are used rather than held in reserve.
Both sites start with the charging infrastructure. The same controller acts on batteries, heat pumps or refrigeration plants. How learning algorithms factor in forecasts for PV yield and load is described in the article energy management with AI.