Thinking Energy.
Delivering Solutions.

Gebrüder Weiss AG

Switzerland's First Alpitronic HYC1000 Charger

Charging power
500 to 1'000 kW DC
Type
Infrastructure, Electrification

Gebrüder Weiss is electrifying its vehicle fleet and needed charging infrastructure at its Altenrhein site that serves four vehicles today and twice as many tomorrow. Ampere Dynamic delivered a fast-charging park built around the Alpitronic HYC1000 with a total output of up to 1’000 kW, together with Gebrüder Weiss. Two EV dispensers provide four DC charging points. Commissioning on 10 June 2026 took place jointly with Alpitronic and was the first HYC1000 commissioning in Switzerland.

The HYC1000 uses a decentralised architecture with a central power cabinet and physically separate dispensers. For now, 500 kW of DC charging capacity is available, expandable to 1’000 kW. The integrated dynamic load management distributes the available power between connected vehicles in steps of 62.5 kW. This keeps the installed power electronics working rather than reserved, and every vehicle receives as much power as it can absorb at that moment.

The design already accounted for two additional EV or MCS dispensers, and therefore eight charging points. Civil works, grid connection and controls are dimensioned for that expansion, so it will not require a second construction site. The charging infrastructure grows with the fleet from day one.

Our thanks go to Gebrüder Weiss for their trust, to TSG as the supplier of the Alpitronic charging infrastructure, and to Brander AG of Berneck as the electrical contractor for their collaboration on the project.

What matters when dimensioning commercial charging parks is covered in our guide Charging infrastructure for businesses. The full offering for fleet operators is described on the solution page Logistics electrification.

The charging park in Altenrhein

Technical Specifications

TypeInfrastructure, Electrification
IndustryLogistics and transport
Year2026
Charging power500 to 1'000 kW DC
Charging points4